PROJECT DESCRIPTION
Dear Sir/Madam,
You are invited to participate in our survey on life-cycle costing of buildings. In this survey, respondents will be asked to complete a survey that asks questions about the respective life-cycle (same as whole-life) cost of simulated Building Configuration Permutations (BCP) as applied to medium-sized office buildings. The aim of the project is to obtain information on the most representative whole-life cost of retrofit options in medium-sized office buildings. It will take approximately 3 - 6 minutes to complete the questionnaire. For the purposes of this survey, a medium-sized office building is one, which is 3-storeys tall and has between 50,000 - 100,000 square feet (SF). A number of most common pictorial building configuration permutations (BCP) have been identified and by selecting the retrofit option which most resembles your building configuration will lead on to possible whole-life cost estimates.
Your participation in this study is completely voluntary. There are no foreseeable risks associated with this project. However, if you feel uncomfortable answering any questions, you can withdraw from the survey at any point. It is very important for us to learn your opinions.
Your survey responses will be strictly confidential and data from this research will be reported only in the aggregate. Your information will be coded and will remain confidential. If you have questions at any time about the survey or the procedures, you may contact Olubukola ("Bukky") Tokede at +447404268590 or by email at [email protected]. If required, please indicate if you would like to be kept up-to-date with developments on the research and we will be more than happy to share our findings with you. A space is provided at the end where this can be indicated.
Thank you very much for your time and help. Please start with the survey now by clicking on the Continue button below.
|
| |
|
|
|
Which of the following job-descriptions best matches your role in relation to the medium-sized office building you are involved with? Please feel free to tick more than one. |
| |
|
|
|
|
|
|
|
|
|
Which of the following best describes the retrofit option embarked upon in the uncommissioned building, you are involved with? |
| |
|
|
|
|
Do you currently have a "Temperature Reset" strategy feature in this office building ? |
| |
|
|
|
|
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building you are involved with? where "x" means feature is available? |
| |
|
|
|
|
Does the office building you are involved with possess a "Smart Grid", as an energy conservation measure ? |
| |
|
|
|
|
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building, you are involved with? where "x" means feature is available. |
| |
|
|
|
|
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building you are involved with? where "x" means feature is available. |
| |
|
|
|
|
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $99,549 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period.? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $611,939 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $88,288 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $795,236 provide a fair estimate of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $80,455 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $763,036 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $93,992 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofit, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,875 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,100,638 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair and current estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,882 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,101,444 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76,039 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,284,741 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,672 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,291,717 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $89,708 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,123,708 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected, does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $91,428 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,104,654 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $87,678 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,141,306 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $86,064 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,287,721 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $70,377 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,468,032 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,875 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,149,032 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,803 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,333,220 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,970 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,328,639 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,876 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,334,976 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,461 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,518,272 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,094 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $79,755 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $78,587 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,178,974 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $67,327 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 362, 270 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $59,493 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 361, 283 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $77,509 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 365, 696 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57,419 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 548, 992 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,543 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 211 359 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $95,162 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 219,977 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $83, 901 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 403, 273 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76,068 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 398, 186 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92, 396 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 387, 798 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69, 380 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 571, 094 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61, 504 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 276, 156 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76, 760 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1, 284, 775 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65, 499 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,468, 071 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57, 666 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,463, 016 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $75, 864 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,509, 635 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57, 126 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,692, 931 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $52,873 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,218, 549 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,472 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,279, 633 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,370 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,485, 799 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,965 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,507, 660 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69,185 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,690,956 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,309 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,804,531 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,494 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,024,721 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,015 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,221,501 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,298 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,404,797 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,422 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,325,494 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $52,666 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,508,790 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,413 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,383,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76,609 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,515,868 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $85,297 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,699,164 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,930 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,370,163 provide a fair estimate of the capital cost of the retrofitting of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $64,914 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,539,190 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $93,764 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,804,531 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,494 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of 2,689,837 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,999 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,606,203 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $80,522 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,614,542 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,331 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,561,919 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $77,279 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected, does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,601,495 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $67,327 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,932,668 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57,419 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,810,318 provide a fair estimate of the capital cost of the retrofitting carried out on your building? |
| |
|
|
|
|
Given the option selected, does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69,380 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,188,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,788,473 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,298 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutations to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,082,840 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,930 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,815,712 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $64,914 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,043,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,112,358 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,999 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,028,724 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $80,522 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,998,219 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,331 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,211,849 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,021 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas ) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,851 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,960,843 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $54,388 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,363,886 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $53,484 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,348 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,851 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,179,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $1,995,007 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,599 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,920,843 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,554,756 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,799 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (I.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,131,887 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,165 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,839,203 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,416 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,291 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,420,014 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $43,097 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,860,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $45,925 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,719,567 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $47,849 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,291 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitted, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitted, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,784,358 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $4,525,767 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,128 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $2,604,506 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $47,717 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (I.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $3,564,506 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected, does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $44,390 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $4,340,325 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $50,592 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $4,484,777 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
Given the option selected does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $40,226 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building? |
| |
|
|
|
|
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period? Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life? |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life? |
| |
|
|
|
|
Given the option selected does the sum of $4,484,777 provide a fair estimate of the capital cost of the retrofitting carried out in your building? |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
What will you consider the most uncertain factor in estimating the whole-life cost of your building? |
| |
|
|
|
|
|
Did you consider the long-term running cost (Energy Cost, Maintenance Cost, Utility Cost etc) of the building prior to making an investment decision on the respective components that are present in the built facility? |
| |
|
|
|
|
|
In the occasion of a major refurbishment, which of the following options may be most appropriate for your building? |
| |
|
|
|
|
|
Given a decision for a new-build which building permutation will appeal to you as the most cost-saving, among the following options? where "x" means feature is available. |
| |
|
|
|
|
| If you will like to be kept updated with developments on the research, please provide an email address here: | | |
|
|
|
|
To what extent is whole-life costing or (life-cycle costing) considered in any of the retrofit investment decisions that has been made byyour firm? |
| |
|
|
|
|