This free survey is powered by
0%
Exit Survey
 
 
Welcome to the MOM Section 6 Restructure Survey!

As a result of the concern within the logistics community that Section 6 of the NMP-MOM should be structured differently, a Tiger Team was formed to develop restructure options (using Revision 4 as the baseline), conduct a survey to garner input and recommendations, and determine a recommendation to management for approval. The survey is completed online using the link provided below. The survey is now open and we urge you to take approximately 15-30 minutes of your time to take this survey. The feedback you provide through your participation in this survey is valuable to management, and will be the major input used by the Tiger Team for the restructure recommendation. If you have any questions concerning this process, please contact either myself ([email protected]) or Kim Jensen ([email protected]). We appreciate you taking the time to provide your input.
 
 
 
What is your role in the Navy Modernization Program (NMP) process?
 
SPM Headquarters/PEO
 
TYCOM
 
PARM
 
ISEA
 
RMC
 
FLC
 
RMMCO
 
PY
 
AIT 06
 
CDM
 
PMR/OSLR
 
Fleet User
 
Other (please specify)
 
 
 
 
On the average, how often do you use or consult MOM Section 6?
 
Never
 
Once a year or less
 
Once a month or less
 
Once a week or less
 
More than once a week
 
 
 
What information do you most commonly seek when using MOM Section 6?
 
ILS/HSI requirements prior to SCD development
 
SCD development or approval
 
Logistics Certification
 
Installation and checkout
 
Other (please specify)
 
 
 
 
What about the existing MOM Section 6 is working well? (Please be specific and provide examples if possible.)
   
 
 
 
What about the existing MOM Section 6 is not working well and could be improved? (Please be specific and provide examples if possible.)
   
 
 
 
In the past, the MOM Section 6 was written to be a "one-stop shopping" source for logistics information so the reader does not have to consult other resources as often, although this increased the section's size and complexity. There is a proposal to limit Section 6 to only modernization-related information not contained elsewhere which would shorten and simplify Section 6, but require users to refer to other documents more often. Which approach do you prefer?
 
As much information as required to be a single-source document
 
Mostly single-source information with some references
 
No preference
 
Mostly modernization-only information with some key information that is referenced elsewhere
 
Only use modernization-related information not referenced elsewhere
 
 
Currently the MOM Section 6 is structured in groups of installation processes and logistics disciplines. Three proposed structures are being considered for Section 6; which do you prefer?
Least DesirableMost Desirable
1 2 3 4 5 6 7 8 9 10
Keep the same structure (see the table of contents emailed to you)
Adopt a purely ILS discipline approach utilizing the DAU ILS disciplines
Utilize a phased, or timeline, structure where ILS efforts are considered through the installation process (development, SCDs, ILS Certification, installation and checkout)
 
 
 
Thank you for your feedback. If you have any questions concerning this process, please contact either myself ([email protected]) or Kim Jensen ([email protected]). We appreciate you taking the time to provide your input.