SIGN UP FREE
Survey Templates Surveys Ozan1

Ozan1

Ozan1


Dear colleague,
thank you for making the time to complete this online questionnaire. This survey has been sent to approximately 300 professionals to investigate the use of mobile visualisation technologies in construction. It will take approximately 10 minutes to complete. Your participation in this study is completely voluntary. There are no risks to you, or further commitments from you, as a result of taking part in this activity. If you feel uncomfortable answering any questions, you can withdraw from the survey at any point. Your views are however very important for us so your help will be greatly appreciated. If you have any queries at any time while completing the questionnaire please do not hesitate to contact me Ozan Koseoglu at +44(0)1509 228799 or by email to [email protected].



Section 1: Personal Details and Organisational Information
Name & Surname
Main Role in Organization
Experience in construction (number of years)
Email
Telephone
Full name of organisation
Approximate number of people employed
Annual Turnover of organisation
Website adress
Country
Please indicate the core business activities of your organization.

Section 2: Wireless and Mobile Technologies in Construction
 
5.
What is the frequency of use of the following wireless technologies on a construction project?

Always
Frequently
Sometimes
Never
GPRS (General Packet Radio Service)
3G (Third Generation Mobile Technology)
Bluetooth
WLAN (Wireless Local Area Network)
6.
Please indicate the frequency of use of the following mobile devices on construction projects (A brief explanation of each is provided at the end of survey).
Always
Frequently
Sometimes
Never
Personal Digital Assistant (PDA)
Pocket PC
Tablet PC
Laptop
Wearable Computer
Smartphone
Bluetooth Headset
Digital Pen & paper
7.
If you have used any of the mobile and wireless technologies or devices mentioned in Q5 & Q6, in which of the following activities were they used and how often?
Always
Frequently
Sometimes
Never
Distribution of design documents
Monitoring progress on site
Monitoring quality of construction
Monitoring costs
Health & Safety checks on site
Information/ Knowledge management
Defects management
Building Inspections

Section 3: Visualisation Technologies in Construction
8.
What is the frequency of use of the following on a typical construction project?
Always
Frequently
Sometimes
Never
2D drawings
3D modelling
4D modelling (3D models + Time dimension)
Virtual reality (VR) and Animation
nD modelling (3D models + number of management functions such as resource, material, cost, etc.)
9.
At what stage do you use the following visualisation technologies on a construction project?

2D
3D
VR and animation
4D
nD
None-used
Client Briefing
Feasibility
Conceptual Design
Detailed Design
Project Planning
Construction
Marketing
Facilities Management

Section 4: Design-Construction Collaboration on Site
 
11.What are the main causes of these design changes?
12.How long does it usually take to update drawings once a design rework has been identified on site?
13.What % of the project cost is typically spent on design changes and the associated costs of issuing and distributing new drawings?
14.
How often are the following used to resolve design problems on site?
Always
Frequently
Sometimes
Never
Face-to face meeting
Email
Fax
Telephone
Mail / courier
Teleconference
Videoconference
Project Extranet
Visualisation and simulation
15.
There are some benefits which may be gained from using visualisation, mobile computing and wireless connectivity for design problem resolution on site, electronic drawing update and re-distribution. Please indicate how important these benefits are to the sucess of a construction project.
Essential
Very Important
Important
Not Important
Real-time decision making
Real-time access to project design information
Reductions in design rework ( change orders, RFI,etc.)
Online 3D displays of design information
Communicating design information to/from site
Improvement in controlling costs through improvements in monitoring construction status
Reduced financial burden on printing and courier costs.
Improvements in the management of design change processes
Any other comments would you like to add?
Mobile Devices Explanation

Related templates and questionnaires