This free survey is powered by QUESTIONPRO.COM
0%
Exit Survey »
 
 
The Multi-Level BoM-Report has a column that displays the aggregated sum of lead time and follow-up time starting from the root part of the BoM for each depot/part and process node.
We are looking for an easy and understandable name for this column.
Please review and comment on the proposals or make your own proposals.
 
 
 
Proposal 1 (current): Offset time - the value is an information of how long a change needs to propagate to the root node. As it is the sum of lead and follow-up time, it is more than an accumulated lead time.
   
 
 
 
Proposal 2: Lag time - "Lag" makes clear that a certain amount of time passes
   
 
 
 
Proposal 3: Pipeline time - The time material "in the pipeline" from the node to root takes
   
 
 
 
Your Proposal
   
 
 
 
New label for "Show BoM only"

There have been some irritations w.r.t to the checkbox "Show BoM only". Therefore there has been the request to change the name for this option.
 
 
 
Proposal 1: "Show BoM only" -- current label. Because it only shows the information given in the BoM (plus the type of procurement process)
   
 
 
 
Proposal 2: "local production only" -- indicates that the result is about production and limited to a local scope but introduces the concept "local".
   
 
 
 
Proposal 3: "limit to BoM" -- makes clear that the result is limited somehow and lets user know that she (gender diversity) gets only information on the BoM.
   
 
 
 
Your comment
   
 
Survey Software Powered by QuestionPro Survey Software